2012
 06 Performed development project with Small and Medium Business Administration - The highly precise Fiber Optic Gyroscope and simulator
 05 Performed Shin-Hanul Nuclear Power Plant 1,2 (Tsurumipump, Japan) - Condenser vacuum pump package
 04 Performed Vietnam Mong Duong Ⅰ Thermal Power Plant 1,2 (Doosan) - Stator water cooling system
 03 Performed Vietnam Mong Duong Ⅱ Thermal Power Plant 1,2 (Doosan) - Stator water cooling system - Shaft seal oil system
2011
 06 Performed a project with Small and Medium Business Administration - Development of high performance ECS and LOP to control Fuel Rack position for high speed engine of vessel.
 03 Performed India Raipur Thermal Power Plant 1,2 (Doosan) - Stator water cooling system - Shaft seal oil system
 01 Contracted commissioning work of new vessel for I.G.S & I.G.G with Alborg.
2010
 04 Registered as a qualified panel maintenance company (Korea South-East Power)
2009
12 Established R&D center
 05 Awarded best cooperative company (Doosan Engine)